Oil & Gas Pipeline Project Experience
SAM, Inc. is Op Qual certified for abnormal operating conditions and locating/marking pipelines as well as fully DOT Compliant.
Eagle Ford Project
Project Control, Civil/Alignment and Easement Surveys, Crossing Permit Surveys, and Construction/As-Built Surveys
Acadian Haynesville Project
Project Control, Civil/Alignment and Easement Surveys, Crossing Permit Surveys, and Construction/As-Built Surveys
White Wing Trail Project
Pipeline relocation, Right-Of-Way acquisition, Design and As-Built Surveys
Line 5 Project
Project Control, Civil/Alignment and Easement Surveys, Crossing Permit Surveys, and Construction/As-Built Surveys
Gulf South Pipeline Southeast Expansion Project
FERC Application Ortho-Imagery - Hatch Mott McDonald
Gulf South Pipeline East Texas to Mississippi Expansion
FERC Application Ortho-Imagery - Universal Ensco
ExxonMobil (Barnet Shale)
Regulatory Compliance HCA Study - Mustang Engineering
Alliance Pipeline (US Portion)
Regulatory Compliance Updated Ortho-Imagery
Eagle Ford Project
Project Control, Civil/Alignment and Easement Surveys, Crossing Permit Surveys, and Construction/As-Built Surveys
This 30-mile project consisted of providing placement of project control, alignment/civil, easement and crossing surveys. SAM, Inc. provided Preliminary Alignment Sheets, Easement Acquisition and Site Plats/Descriptions, Construction and As-built surveys.
Location: Webb, McMullen and LaSalle Counties, Texas
Client: EPCO
Acadian Haynesville Project
Project Control, Civil/Alignment and Easement Surveys, Crossing Permit Surveys, and Construction/As-Built Surveys
This 100-mile project consists of providing placement of project control, alignment/civil, servitude and crossing surveys. SAM, Inc. is providing Preliminary Alignment Sheets, Servitude Acquisition and Site Plats/Descriptions, Construction and As-built surveys.
Location: Avoyelles, Rapides, Pointe Coupe, and St. Landry Parishes, Louisiana
Client: EPCO
White Wing Trail Project
Pipeline relocation, Right-Of-Way acquisition, Design and As-Built Surveys
SAM, Inc. provided an as-built survey of a ½ mile existing Enterprise Products pipeline in order to establish its existing easement. The existing pipeline was in conflict with a proposed roadway. Using the proposed road design plans, SAM, Inc. located the proposed road right of way and performed a design survey for the relocation of the existing pipeline adjacent to the proposed road right of way. SAM, Inc. produced easement plats and field notes for the proposed route. The proposed pipeline and its easement were staked for construction. An as-built survey was performed for the relocated pipeline.
Location: Hays County, Texas, Proposed White Wing Trail
Client: EPCO
Line 5 Project
Project Control, Civil/Alignment and Easement Surveys, Crossing Permit Surveys, and Construction/As-Built Surveys
This 20-mile project consisted of providing placement of project control, alignment/civil, easement and crossing surveys. SAM, Inc. provided Preliminary Alignment Sheets, Easement Acquisition and Site Plats/Descriptions, Construction and As-built surveys.
Location: Cotulla, Texas
Client: EPCO
Gulf South Pipeline
Southeast Expansion Project
FERC Application Ortho-Imagery - Hatch Mott McDonald
111 miles of 42" pipeline from Harrisville, Mississippi to West Butle, Alabama. Project specs follow.
Project Length: 111 miles
Corridor Width: 1.0 mile
Pixel Resolution: 0.25m
Horizontal Accuracy: Sub-meter
Imagery Format: 24 bit true color TIFF's
Coordinate Base: East Mississippi State Plane, NAD 83 datum, US foot units
Gulf South Pipeline
East Texas to Mississippi Expansion
FERC Application Ortho-Imagery - Universal Ensco
Portions of 242 miles of 42" pipeline from Louisiana to Mississippi. Project specs follow.
Project Length: Four separate areas (beginning NW of Bosco, LA east to Delhi, LA)
Corridor Width: 1.0 mile
Pixel Resolution: 0.25m
Horizontal Accuracy: Sub-meter
Imagery Format: 24 bit true color TIFF's
Coordinate Base: UTM zone 15, NAD 83 datum, US foot units, Central Meridian 93d W
BACK TO TOP
ExxonMobil (Barnet Shale)
Regulatory Compliance HCA Study - Mustang Engineering
+ 42 mile natural gas pipeline near Ft. Worth , TX owned by ExxonMobil Pipeline Company
+ Pipeline classification study required; houses and other buildings in close proximity needed to be classified and counted
+ 1"=200' scale imagery for a 3,700 foot wide corridor was captured the same day SAM, Inc. received the Notice to Proceed
+ Imagery was flown, processed, rectified, plotted and hand-delivered in only 9 days.

Alliance Pipeline (US Portion)
Regulatory Compliance Updated Ortho-Imagery
SAM, Inc. is currently working on Orthorectified Aerial Imagery for the US portion of Alliance Pipeline. Project specs follow.
Project Length: 888 miles running from near Sherwood, ND southeast to near Aux Sable, IL
Coordinate Projection: Albers Equal Area NAD83 (set as survey-foot). CM=90, Latitude of Origin = 45, STD Parallel 1 = 45.5, STD Parallel 2 = 29.5
Imagery Format: Color - Conventional film
Pixel Resolution: 1.0 ft
Photo Scale : 1:24,000 (1"=2000')
Imagery Width : 12,600 ft corridor
Flight Altitude : 12,000 ft above mean terrain (AMT)
Approx. # of Flight Lines: 39
Approx. # of Exporsures : 722
Digital Scanning : 12.5 microns (2032 dpi)